QQ登录

只需一步,快速开始

登录 | 注册 | 找回密码

三维网

 找回密码
 注册

QQ登录

只需一步,快速开始

展开

通知     

查看: 1159|回复: 0
收起左侧

[风能] Four-Step Procedure of Micro-Siting in Wind Farm Projects

[复制链接]
发表于 2008-11-5 08:59:00 | 显示全部楼层 |阅读模式 来自: 中国湖南湘潭

马上注册,结识高手,享用更多资源,轻松玩转三维网社区。

您需要 登录 才可以下载或查看,没有帐号?注册

x
Abstract:
5 n: T# n' t: u  ~1 c# qA four-step procedure of micro-siting in wind farm projects, as a solution of past projects, is presented. It is a method included four steps, “optimization at wind resources, adjustment from construction condition, inspection on environment target, and review with comprehensive consideration”. Some relations in important factors are illustrated also.6 v( t. n: L( w/ T6 {
Keywords: wind turbine, micro-siting, wind farm project

Yang Jianshe.pdf

334.94 KB, 下载次数: 8

发表回复
您需要登录后才可以回帖 登录 | 注册

本版积分规则


Licensed Copyright © 2016-2020 http://www.3dportal.cn/ All Rights Reserved 京 ICP备13008828号

小黑屋|手机版|Archiver|三维网 ( 京ICP备2023026364号-1 )

快速回复 返回顶部 返回列表